Road and Rail Bridges
The success of our bridge projects often lies in our ability to overcome the logistics of delivering plant and materials. We have developed strong and reliable temporary works systems such as kitset access staging that reduces the headaches of working at height and saves ‘reinventing the wheel’ for each project.
In addition, our inhouse temporary works design team lead the industry in innovative value engineering and working with challenging restrictions. We are adept at a range of bridging techniques: balanced cantilever, incremental launch, in-situ and precast construction.
At BPC we are particularly experienced at working with existing structures and solving difficult problems with outside-the-box thinking.
Recently completed projects include Wairoa River Bridge Cycleway, Waikato Freight Hub, Whirokino Trestle and Fiji Four Long Bridges.