Foundations Infrastructure Environment
  • Home
  • Projects
  • Sectors
  • Resources
  • Health & Safety
  • About
  • Contact
Home : Projects
Search
GO
Sort Project List
By completion date
By project name
By location
Projects
Page:
 
 
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
 
 
Sort by: | Completion Date | Project Name | Location | Sector |
A324 Bayswater Footbridge  The project for Auckland City Council is to widen the existing footbridge; to allow for better flow through of cyclists and pedestrians through the… >
Date: Sep 2014
Location: Auckland
Sector: Infrastructure
Akatarawa Bridges  Involves the replacement of three old one-lane timber bridges with new two-lane concrete bridges in rural Upper Hutt. >
Date: Oct 2011
Location: Wellington
Sector:
Arapuni Dam Foundation Enhancement Project  Arapuni Dam is a high curved concrete gravity dam across the Waikato River. >
Date: Jun 1990
Location: Waikato
Sector: Infrastructure
Auckland International Airport, Runway/Taxiway Repairs  Scope included construction of 15,000m² of new gate hold area adjacent to the domestic terminal. >
Date: Jan 1998
Location: Auckland
Sector: Foundations
Brian Perry Civil - Tank Cleaning  Since 1984 Brian Perry Civil have developed specialised techniques and equipment for the cleaning of bulk fuel storage. >
Date: Jan 2005
Location: Various
Sector: Environment
CentrePort Area F Business Park, Wellington  CentrePort was a large landscaping project for CentrePort Wellington. >
Date: May 2009
Location: Wellington
Sector: Foundations
 
© Copyright 2021 .The Fletcher Construction Company Limited | Privacy Policy | Terms of Use | Website by Cobussen