Projects : Civil Structures
List all projects
CentrePort Area F Business Park, Wellington  CentrePort was a large landscaping project for CentrePort Wellington. >
Date: May 2009
Location: Wellington
Sector: Foundations
Upper Mangatawhiri Dam: Spillway Upgrade  The Upper Mangatawhiri Dam is an earthfill embankment approximately 35m high and 494m long at the crest. >
Date: Nov 2007
Location: Hunua Ranges
Sector: Foundations
Avalon Drive Bypass  Avalon Bypass will provide a free-flowing high capacity route bypassing the congested section of Avalon Drive. >
Date: Feb 2007
Location: Auckland
Sector: Foundations
Newmont Waihi Gold Shafts - Waihi  Newmont Waihi Gold contracted BPC to construct two steel lined vertical shafts from the mine surface to the mine gallery >
Date: Sep 2006
Location: -
Sector: Foundations
Silverstream Overflow Storage Facility  Construction and commissioning of a reinforced concrete storage tank with 10,000 cubic metre capacity. >
Date: Jul 2006
Location: Hutt City
Sector: Foundations
Awaroa 4 - Waste Haul Road Overpass  The Awaroa 4 overpass was commissioned by Solid Energy NZ to facilitate the movement of overburden material. >
Date: Jun 2006
Location: Awaroa
Sector: Foundations
Auckland Bowden Road Weir  Construction of a piled reinforced concrete stormwater outlet structure to replace the existing outlet structure. >
Date: Dec 2005
Location: Auckland
Sector: Foundations
Huntly Cooling Tower : Foundations  Cooling tower basin, seal pit and boost pump pit, outfall culvert & inflow pipeline. >
Date: Sep 2005
Location: Huntly
Sector: Foundations
Wellington City Council Overflow Tank  In order for the Wellington City Council to comply with a consent condition that sewage overflows not discharge to... >
Date: Sep 2004
Location: Wellington
Sector: Foundations
Auckland International Airport, Runway/Taxiway Repairs  Scope included construction of 15,000m² of new gate hold area adjacent to the domestic terminal. >
Date: Jan 1998
Location: Auckland
Sector: Foundations