Leamington Trunk Watermain Stage 1 and 2 : Cambridge
  • 1
Client: Waipa District Council
Contract Value: Total $1.5m
Completed: Nov 2009
Main Contractor: Brian Perry Civil

Stage 1

Construction of 2070m of 450 OD water-main with associated fittings and valves

Stage 2

Supply and install 2000m of 450mm OD HDPE with associated fittings.

Works included:

  • 2912m of 450OD P.E 100 PN12 SDR 13.6 MDPE Pipeline. Fusion welded with data logging, located in road berm.
  • 1158m of 375mm Blue Rhino mPVC watermain – rubber ring jointed – located in roadways.
  • Supply and installation of bends and branches with anchor blocks.
  • Supply and installation of 375mm dia sluice valves.
  • Reinstatement of berms and sealed roadways
  • Connect both ends to existing watermains.

Traffic Management to NZTA Level 1