Mobil Woolston T11 Refounding  Installation of 200 stone columns, founded up to eight metres deep to provide solid grounding for large the earthquake damaged tank. >
Date: Sep 2013
Location: Christchurch
Sector: Foundations
Clyde Quay Wharf Slab Jacking  The lowering of 30 cast in-situ concrete slabs using hydraulics to form the base of an under-wharf car park within a tidal zone. >
Date: Aug 2013
Location: Wellington
Sector: Foundations
Piripaua Transformer Civil Works  Supply and installation of two new transformer slabs to house two new 65 Ton power transformers for Genesis Energy in poor ground conditions. >
Date: Aug 2013
Location: Tuai
Sector: Foundations
Wairakei to Whakamaru C Line Project  New Transpower line to give greater capacity for transferring energy generated from new local geothermal power stations. >
Date: Jul 2013
Location: Taupo
Sector: Infrastructure
Clyde Quay Wharf  Piling works situated on the old Overseas Passenger Terminal. >
Date: Apr 2013
Location: Wellington
Sector: Infrastructure
A325 Metlifecare Piling  The Metlifecare Piling project involves installation of 80 piles over a tight time frame in difficult ground conditions. >
Date: Apr 2013
Location: Auckland
Sector: Foundations
Tuai Penstocks Pile Supported Foundation  Bored pile foundation and reinforced concrete support beams to existing penstocks. >
Date: Nov 2009
Location: -
Sector: Infrastructure
Tauranga Harbour Link Stage 2 Piling  Brian Perry Civil were part of the team to design and construct the Tauranga Harbour Link Stage 2. >
Date: Jul 2009
Location: Tauranga
Sector: Infrastructure
Bank of New Zealand Piling  Ground obstructions in addition to the basalt wall included existing timber piles and belled concrete piles. >
Date: Sep 2007
Location: Auckland
Sector: Infrastructure
Central Motorway Junction  Installation of 100 rotary bored piles 600mm to 1500mm diameter to depths of 30 metres. >
Date: Nov 2005
Location: Auckland
Sector: Infrastructure
Northern Busway Piling - Stage 1A, 1B, 1C  The Northern Busway Project, awarded to Fletcher BPC JV in 2004, consists of six kilometres of two way… >
Date: Dec 2004
Location: Auckland
Sector: Infrastructure
Project Eastport  Brian Perry Civil installed the piles for the new Golden Bay Cement bulk storage facilities. >
Date: Oct 2000
Location: Auckland
Sector: Infrastructure
Mokai Geothermal Power Station  2700 stone columns up to 11 metres long were constructed in volcanic soils to reduce ground liquefaction. >
Date: Jan 1999
Location: Mokai
Sector: Infrastructure
Arapuni Dam Foundation Enhancement Project  Arapuni Dam is a high curved concrete gravity dam across the Waikato River. >
Date: Jun 1990
Location: Waikato
Sector: Infrastructure