At 5.30pm on the 30th June the first load of material was dumped into the relocated Stamler hopper for the full commissioning of the Stamler feeder/breaker. Aside from a couple of minor hiccups everything worked like clock-work resulting in a lot of smiles and relief all round. ... more >>
Latest Video Feed
D-wall Construction
Brian Perry Civil as part of the Victoria Park Tunnel project in downtown Auckland.