Newmont Waihi Gold Shafts - Waihi
Client: Newmonth Waihi Gold Location: September 2006
Engineer: N/A, NZS 3915 Main Contractor: Brian Perry Civil
Value: $2.8m Completed: September 2006

 

 

Click image(s) to enlarge

 

Newmont Waihi Gold contracted BPC to construct two steel lined vertical shafts from the mine surface to the mine gallery a further 90 metres below.

The completed shafts while identical in dimension performed two different functions, the first providing a conduit for ventilation and the second providing Emergency Access /egress.

Each completed shaft was 2.50 metres in diameter and lined with a 20mm steel casing.

A significant challenge overcome by the project team was ignimbrite, andesite and quartz material encountered on the shaft alignments with compressive strengths of 330 MPa.

A considerable amount of specialised tooling was developed in-house to overcome the variable drilling material encountered. namely chisels and rotary drilling heads.  Also utilised during the project were a 600t capacity Oscillator and the R625 rotary drill rig.

The work scope included:

  • Placing of a permanent 50m sheet pile retaining wall.
  • Design and construction of a temporary steel working platform for the R625 Rotary Drill Rig.
  • Construction of a 30m x 8m x 300mm reinforced concrete slab.
  • 4 x 900 dia UC Torque Reaction piles incorporated into slab for the Oscillator housing.
  • Drilling of two shafts at 2.5m dia x 90m to 0.5% vertical tolerance.
  • Steel lining both shafts with 20mm casing.

View more gallery images

 
News - Updates
  • We are very pleased to announce that on Friday evening we won the premium award for the $5m to $20m category in the Hirepool NZCF awards for the Waiwhetu Stream Project more >>
  • Brian Perry Civil has been awarded the Ingenium Excellence Award for the Achilles Point Lookout and Reserve Project. more >>
  • The Cliff Road Retaining Wall project carried out in St Heliers, Auckland won the 2009 NZCF Hirepool Award in Category 3.... more >>
  • The Waitakere Dam Upgrade Project won the 2009 Environmental Award in Category 2 ($500 to $2m) more >>
Locations
The Fletcher Construction Company Limited trading as Brian Perry Civil
 
Auckland Hamilton Wellington