New Lynn Rail Trench
New Lynn Rail Trench - Tension Piling 
Client: Ontrack
Location: Auckland
Engineer: Beca
Main Contractor: Fletcher Construction Engineering
Value: $4m
Started: 
Completed:  May 2009 

 

This piling subcontract is part of the overall New Lynn Rail Trench currently under way.

Scope of Works:

Bored Piles

  • Construction of 246 x 750 dia bored cast in-situ piles (piles are used for tension and compression)
  • Depths of piles range from 25m - 50m, with the majority being constructed under Bentonite support fluid.

H-Piles

  • Drive 168 x 310UC 109kg/m H-Piles.
  • Piles will act as end bearing support for a capping beam, on which passenger trains will travel.
  • Lengths range from 18m - 40m with a maximum UDR of 2540kN at bridge locations.

Logistics

  • Full co-ordination with ONTRACK safe working procedures.
  • Strict lifting restrictions in place (no lifting >6m before 09:00 or after 15:00)
  • Working with Rail Track protectors
  • Rail corridor approximately 1km x 10/14m.
  • Working in close proximity to the general public.
  • Various footpaths through working site to/from platform and street access.
  • Strict environmental controls (all excavation areas to have bunds in place)
  • 24/7 Day and Night shifts with noise control

Brian Perry Civil were performing this work in a live rail corridor, with trains passing every 15 -20 minutes. 

 

 

Click image(s) to enlarge

View more gallery images

 
News - Updates
  • We are very pleased to announce that on Friday evening we won the premium award for the $5m to $20m category in the Hirepool NZCF awards for the Waiwhetu Stream Project more >>
  • Brian Perry Civil has been awarded the Ingenium Excellence Award for the Achilles Point Lookout and Reserve Project. more >>
  • The Cliff Road Retaining Wall project carried out in St Heliers, Auckland won the 2009 NZCF Hirepool Award in Category 3.... more >>
  • The Waitakere Dam Upgrade Project won the 2009 Environmental Award in Category 2 ($500 to $2m) more >>
Locations
The Fletcher Construction Company Limited trading as Brian Perry Civil
 
Auckland Hamilton Wellington