| Leamington Trunk Watermain Stage 1 and 2 : Cambridge |
| Client: Waipa District Council |
Location: Cambridge |
Engineer: Stage 1: Duffill Watts Ltd Stage 2: Beca Carter |
Main Contractor: Brian Perry Civil |
| Value: Total $1.5m |
Completed: Stage 1 : June 2008 Stage 2 : May 2009 |
Click image(s) to enlarge
Stage 1
Construction of 2070m of 450 OD water-main with associated fittings and valves
Stage 2
Supply and install 2000m of 450mm OD HDPE with associated fittings.
Works included:
- 2912m of 450OD P.E 100 PN12 SDR 13.6 MDPE Pipeline. Fusion welded with data logging, located in road berm.
- 1158m of 375mm Blue Rhino mPVC watermain – rubber ring jointed – located in roadways.
- Supply and installation of bends and branches with anchor blocks.
- Supply and installation of 375mm dia sluice valves.
- Reinstatement of berms and sealed roadways
- Connect both ends to existing watermains.
Traffic Management to NZTA Level 1 View more gallery images |
|
|
|
- We are very pleased to announce that on Friday evening we won the premium award for the $5m to $20m category in the Hirepool NZCF awards for the Waiwhetu Stream Project more >>
- Brian Perry Civil has been awarded the Ingenium Excellence Award for the Achilles Point Lookout and Reserve Project. more >>
- The Cliff Road Retaining Wall project carried out in St Heliers, Auckland won the 2009 NZCF Hirepool Award in Category 3.... more >>
- The Waitakere Dam Upgrade Project won the 2009 Environmental Award in Category 2 ($500 to $2m) more >>
|
|
View All >> |
|
 |
|
|
 |
 |
| The Fletcher Construction Company Limited trading as Brian Perry Civil |
|
| |
|
|